NASA
Jet Propulsion Laboratory
California Institute of Technology
Skip Navigation
Ocean Surface Topography from Space
Stay Connected
menu
close modal
Resources
OSTM/Jason-2 LRA
Published:
September 13, 2010
OSTM/Jason-2 LRA
ENLARGE
Related
The SpaceX Falcon 9 with the Sentinel-6 Michael Freilich satellite is lifted to vertical at Space Launch Complex 4
Sentinel-6 on pad at SLC-4, VAFB
Jason-3 Ready for Launch
Jason-3 Ready for Launch
Headed for Orbit!
Headed for Orbit!
Jason-1 readies for launch in its bay at Vandenberg, AFB (10/31/01)
Jason-1 readies for launch in its bay at Vandenberg, AFB (10/31/01)
Launch preparations are progressing! (11/21/01) Photos: Stacy Mitchell of John Hopkins APL/TIMED project
Launch preparations are progressing! (11/21/01) Photos: Stacy Mitchell of John Hopkins APL/TIMED project
Water Vapor
Water Vapor
Ionospheric Total Electron Content
Ionospheric Total Electron Content
TOPEX/Poseidon launch
TOPEX/Poseidon launch
Jason-1 atop the Delta II Photo: Tom Shain
Jason-1 atop the Delta II Photo: Tom Shain
TOPEX/Poseidon LRA
TOPEX/Poseidon LRA
Jason-1 launch images
Jason-1 launch images
Applications of Spaceborne Altimetry
Applications of Spaceborne Altimetry
Jason-1: LRA instrument
Jason-1: LRA instrument
The Antonov cargo aircraft carrying the Sentinel-6 Michael Freilich satellite touches down on the runway at Vandenberg Air Force Base in California on Sept. 24, 2020.
Sentinel-6 Spacecraft Arrival/Offload
OSTM/Jason-2 Radiometer Antenna
OSTM/Jason-2 Radiometer Antenna
These photos were taken during the Dual Payload Attach Fitting (DPAF) mating operation with Jason-1. (11/13/01) Photos: Scott Michel
These photos were taken during the Dual Payload Attach Fitting (DPAF) mating operation with Jason-1. (11/13/01) Photos: Scott Michel
The Antonov cargo aircraft carrying the Sentinel-6 Michael Freilich satellite touches down on the runway at Vandenberg Air Force Base in California on Sept. 24, 2020.
Sentinel-6 Spacecraft Arrival/Offload
Wave Height
Wave Height
SpaceX Falcon 9 rocket, topped with the Sentinel-6 Michael Freilich satellite secured inside its payload fairing, is rolled to Space Launch Complex 4
Sentinel-6 Rollout at SLC-4, VAFB
Ocean Dynamic Topography
Ocean Dynamic Topography
Radiometer Install - April 2007
Radiometer Install - April 2007
These photos were taken during the Payload Attach Fitting (PAF) mating operation with Jason-1. (11/14/01) Photos: Scott Michel
These photos were taken during the Payload Attach Fitting (PAF) mating operation with Jason-1. (11/14/01) Photos: Scott Michel
Ocean Dynamic Topography
Ocean Dynamic Topography
OSTM/Jason-2 DORIS
OSTM/Jason-2 DORIS
Jason-1 in full flight configuration
Jason-1 in full flight configuration